Macintosh
Business Model Commercial
Minimum CPU Class Required Motorola 68030
Minimum OS Class Required System 7.0
Minimum RAM Required 4 MB
Media Type CD-ROM
Minimum CD-ROM Drive Speed Required 1X
Video Modes Supported 256 Colors Required
Input Devices Supported Keyboard
Number of Players: Offline 1 Player

Windows 3.x
Business Model Commercial
Minimum CPU Class Required 80386
Minimum OS Class Required Windows 3.1
Minimum RAM Required 4 MB
Media Type CD-ROM
Minimum CD-ROM Drive Speed Required 1X
Video Modes Supported 256 Colors Required
Input Devices Supported Keyboard, Mouse
Number of Players Supported 1 Player
Notes 640x480 Super VGA with 256 colors
8-bit Windows compatible sound card
MSDOS 5.0 or higher


Technical information contributed by ClydeFrog (10174), joyvalley (52062), Jeanne Bronze Star Contributing Member (59132) and Agent 5 (5451)
 

Errors and omissions on this page may be reported to the MobyGames approvers.

MobyGames™ Copyright © 1999-2009, MobyGames.
All rights reserved. Do not duplicate or redistribute in any form.
moby sites | about us | advertise | disclaimer | privacy statement | become an approver | RSS