Critical Path (Windows 3.x)
![]() ESRB Rating Genre Perspective Art Gameplay Setting |
72
Critic Score
100 point score based on reviews from various critics. ...
User Score
5 point score based on user ratings. |
Available for Trade | ||||
User | Platform | Comments | Condition | |
jean-louis (32020) | Windows 3.x | L - CC (HYBRID) | Not Specified | |
Buuks (209) | Windows 3.x | None | Not Specified | |
iShrek (3715) | Windows 3.x | None | Box/Packaging: Near Mint Original Media: Near Mint Manual: Near Mint (more info) | |
Wanted for Trade |
||||
User | Platform | Comments | Desired Condition | |
Orakel Esel (14) | Windows 3.x | None | Not Specified | |
Katie Cadet (8442) | Windows 3.x | None | Not Specified | |
rhcocker | Macintosh | None | Not Specified |
MobyGames allows you to track the games you own and track the games you want.
Some of the list features include describing the condition of the game, packaging
materials, media, arbitrary comments, trading features and list access
control. So go ahead and start tracking your collection or start trading games
with fellow Moby Users.
To make a trade, contact the user via email. You can get a users email address by clicking on their screen name. Trades are handled independently of MobyGames, use at your own risk. MobyGames specifically disclaims any warranties, including, but not limited to, the implied warranties of merchantability and fitness for a particular purpose.