Macintosh
Business Model Attribute Image Commercial
Minimum CPU Class Required Attribute Image Motorola 68030
Minimum OS Class Required Attribute Image System 7.0
Minimum RAM Required Attribute Image 4 MB
Media Type Attribute Image CD-ROM
Minimum CD-ROM Drive Speed Required Attribute Image 1X (150 KB/s)
Video Modes Supported 256 Colors Required
Input Devices Supported Attribute Image Keyboard
Number of Offline Players Attribute Image 1 Player

Windows 3.x
Business Model Attribute Image Commercial
Minimum CPU Class Required Attribute Image Intel i386
Minimum OS Class Required Attribute Image Windows 3.1
Minimum RAM Required Attribute Image 4 MB
Media Type Attribute Image CD-ROM
Minimum CD-ROM Drive Speed Required Attribute Image 1X (150 KB/s)
Video Resolutions Supported Attribute Image 640×480 (VGA)
Input Devices Supported Attribute Image Keyboard, Attribute Image Mouse
Number of Offline Players Attribute Image 1 Player
Notes 8-bit Windows compatible sound card
MSDOS 5.0 or higher with Windows 3.1x.


Technical information contributed by ClydeFrog (10547), formercontrib (159487), Jeanne (76519) and Zeppin (8425)