Trivia

Critical Path and QuickTime for Windows 2.1.2 Known Issue

In the Windows version of Critical Path, Apple Computer created a support article for QuickTime telling that after installing QuickTime for Windows 2.1.2, the MCIQTW.DRV from the Critical Path game directory (which is C:\CRITPATH\QTW\ for example) is removed if the user decides to search for an old version of QuickTime for Windows (which is version 1.6.1) on their computer. The only way to correct the problem is that the user needs to copy the file from e.g. C:\WINDOWS\SYSTEM\ to C:\CRITPATH\QTW in order for the game to function properly.

Contributed by Katie Cadet (9585) on Mar 13, 2015. -- edit trivia